Invitation to Bid – M119 Lakeshore Drive Rebuild Phase II
Project Scope & Information
You are invited to bid on a general construction contract. The Contract provides for the furnishing of all labor,equipment, and materials necessary to construct the M-119 Lakeshore Drive Rebuild – Phase 2 Project. Project substantial completion date is December 31, 2020.
The overall scope of the project includes reconstruction of 2,000’ of three-phase 7.2/12.5kV overhead distribution line with new three-phase #1/0 Hendrix aerial spacer cable construction along M-119 / Lakeshore Drive from the City Limits west for 0.38 miles. The distribution line will remain within the same centerline along MDOT road ROW. Construction will be aerial spacer cable utilizing 052AWA messenger and #1/0 AL phase conductor. The project includes all necessary work to set new poles, layout existing conductors, to install new conductor, to transfer existing taps,
transformers, secondaries, and service conductors, and to remove existing poles, conductor, and hardware plus all necessary traffic control and signage. This project is being undertaken to improve system reliability in a heavily treed area along a main three-phase circuit. Submission directions & additional information, please click the below link.